Get a Quote
All Services

Facility Operations Management

Full-scope cost control with budgeting, reporting and subcontractor coordination.

Problem

Uncontrolled growth in facility expenses, multi-vendor management complexity and lack of cost optimisation lead to budget deficits.

Our Solution

Consolidating all operations — including subcontractor management — under one professional umbrella and enforcing strict budget discipline creates a measurable cost advantage.

HOW WE DO IT

Process Steps

1

Projection and planning of operating budget

2

Consolidation of supplier and subcontractor contracts

3

Procurement optimisation and cost analysis

4

Regular budget and performance reporting

Performance Indicators

  • Budget vs Actual Variance Rate (Target: <5%)
  • Supplier Performance Scores
  • Savings Rate Achieved on Existing Budgets

Why Orkun Group?

  • Extensive supplier network and purchasing power
  • Significant cost reductions through consolidated service advantage
  • Fully transparent billing and open-book accounting

Interested in this service?

Contact us now and let us prepare a tailored proposal for your project.

Get a Quote
18%Average Cost Saving
<5%Budget vs Actual Variance
1 PointSingle Coordination Unit
100%Transparent Billing
Why Facility Operations Management?

Take Control of Your
Operating Budget

A building's maintenance, cleaning, security and energy costs tend to grow unpredictably over time. A multi-vendor structure makes coordination difficult; hidden costs inflate the budget.

Orkun Group consolidates all these items under a single professional framework, establishing a manageable, measurable and sustainable operating model.

With economies of scale and collective purchasing power, we achieve an average 18% cost reduction on existing budgets.

Typical Annual Operating Cost Breakdown
Technical Maintenance & Repairs32%
Cleaning & Hygiene24%
Security Services20%
Energy & Environment15%
Management & Reporting9%

* Based on an average equivalent of a 250-unit residential complex.

What's the Difference?

Unmanaged Facility vs Facility with Orkun Group

Unmanaged Facility
  • Separate supplier contracts for each service
  • Uncontrolled growth in operating budget
  • Late or incomplete invoice auditing
  • Reactive response to failures, high downtime
  • No reporting; low cost visibility
Facility with Orkun Group
  • Consolidated subcontractor management under one roof
  • Annual budget vs actual variance < 5%
  • Fully transparent, line-item documented billing
  • Planned maintenance schedule, zero surprise failures
  • Full visibility with monthly budget & KPI reports
How It Works

Full Control in 4 Phases

Our 4-phase structured process — from handover to continuous reporting — is applied with the same discipline at every facility.

Step 1

Operations Status Audit

Current facility budget, supplier contracts and operational vulnerabilities are mapped.

Step 2

Consolidation & Budget Plan

Multi-vendor subcontractor structure is unified under one framework; annual operating budget is created.

Step 3

Operational Takeover

Planned maintenance schedule, shift planning and emergency response protocols are activated.

Step 4

Continuous Reporting & Optimisation

Monthly budget/actual reports and a KPI dashboard ensure continuous improvement.

Subcontractor Coordination

  • Bulk supplier contracts
  • Performance-based evaluation
  • Single point of contact

Budget & Cost Control

  • Annual operating budget plan
  • Line-item expenditure tracking
  • Instant alerts on variances

Reporting & KPIs

  • Monthly budget vs actual report
  • Supplier scorecard
  • Energy consumption analysis

Facility Types

  • Residential complexes
  • Shopping centres & commercial buildings
  • Office complexes & campuses
Frequently Asked Questions

Your Questions Answered

KEY FEATURES

What Sets Us Apart in Facility Operations Management

Cost Control

We manage your facility budget with discipline through economies of scale and accurate planning.

Subcontractor Coordination

We consolidate multiple subcontractor relationships under a single management framework, eliminating operational complexity.

Transparent Billing

Every line item is documented; no surprise invoices or hidden costs.

Budget Reporting

Financial performance is continuously monitored through regular budget-vs-actual reports.